General contractor
Construction period: June2021 г. - December 2022г.
Construction - AO "Philip Morris Izhora"
Industrial building industrial wastewater treatment facilities with a capacity of 400 cubic meters /day with the possibility of receiving peak wastewater discharge for treatment, in the Leningrad region. It includes the supply, installation and commissioning of technological equipment with access to production capacity.